1. Cage Fabrication |
|
2. Cage assembly |
 |
|
 |
3. Putting form oil in base rings |
|
4. Placing inner mold on base rings. |
 |
|
 |
5. Placing T-Lock lining (if required) over inner mold. |
|
6. Reinforcing cage assembly positioned over T-Lock. |
 |
|
 |
7. Placing tamp top over cage assembly set-up. |
|
8. Jacket in place. |
 |
|
 |
9. Concrete pouring |
|
10. Concrete Curing |
 |
|
 |
11. Secondary cure outside curing cell. |
|
12. Coal-tar epoxy painting (if
required) done automatically using the mortar coat machine or manually at the yard. |
 |
|
 |
13. Tipping finished pipe. |
|
14. Pipe at the yard. |
 |
|
|
15. Pipe delivery. |
|
|